eReserve4 is co-located with eReserve6 approximately eight kilometers southeast of the Town of Hardisty, in the Municipal District of Provost No. 52, Alberta. The facilities will be located on privately owned and disturbed land east of the AltaLink owned Nilrem 574S Substation. The project utilizes TESLA’s Megapack2, and provides all power into the Alberta Interconnected Electrical System (AIES). The Lithium-Ion Battery storage system is a stand-alone facility that stores electiricty to discharge into the local distribution system upon demand from the Alberta Electric System Operator (“AESO”).

  • Stage Divested
  • Type Utility Scale Energy Storage
  • Size/Duration 20MW/40MWh

Project Location

This project is located in Clairmont, Alberta. Contact us for more information.