Irrican Power has partnered with TERIC Power to develop the Irrican Chin eBAR (enhanced Battery and Renewables) project. The project is being constructed by TERIC at the SE-26-8-19-W4 surface location, approximately 18 kilometers southeast of the Hamlet of Chin, Alberta. The project is located on privately owned land and consists of a 11.6-megawatt capacity lithium-ion battery storage system. This will be a 2-hours system capable of providing 23.2MWh of energy.

This project is connected to and located adjacent to the existing Chin Reservoir Hydro Plant. The project is being used to store energy provided by both the Hydro Plant and from the Alberta Interconnected Electric System. The project stores excess renewable energy and releases it during periods of high electricity demand and provide grid reliability services to the Alberta Electric System Operator (AESO).

  • Stage Development
  • Type Utility Scale Energy Storage
  • Size/Duration 11.6MW/23.2MWh

Project Location

This project is located roughly 40km east of Lethbridge AB.

See more projects

Stakeholder Engagement

TERIC is committed to working with all stakeholders to keep them informed of our development activities. We pledge to listen to input and to address any concerns, directly consulting with the landowners, occupants, and the residents in the area. We welcome your feedback, so please contact a TERIC representative with any questions or comments regarding the Project.

Contact Us About This Project

Contact info@tericpower.com to request a copy of the project information package by mail or email, or to schedule a telephone consultation with a TERIC project representative.

Alternatively, please use the form below and a TERIC representative will reach out directly:

Request More Information

"*" indicates required fields

Name*